Tin Bath Industrial Camera System
Delivery term:The date of payment from buyers deliver within days- Price:
Negotiable
- minimum:
- Total supply:
- Delivery term:
The date of payment from buyers deliver within days
- seat:
Jiangsu
- Validity to:
Long-term effective
- Last update:
2020-01-27 18:00
- Browse the number:
308
- Changzhou Luming Photoelectric Technology Co., Ltd. By certification [File Integrity]
-
Contact:
luming(Mr.)
- Email:
- Telephone:
- Phone:
-
Area:
Jiangsu
-
Address:
Changzhou Wujin High-tech Zone Changzhou Science and Education City Information Industry Park R&D Building.
- Website: http://www.czlmcctv.com/ http://luming.tianyipaint.net/
Product details
Product Name: Tin bath industrial camera system
Product Model: LM-NZ4000
Product Introduction:
1. Furnace insertion, probe hood can enter tin bath several meters.
2. Turn to high temperature zoom pinhole lens through 90 degree, observe along the workpiece move direction, more intuitively and more fully react specific conditions within furnace.
3. Probe hood use stainless steel materials, with good corrosion resistance.
4. Special dustproof design, the lens does not gather dust.
5. Special water cooling, under the condition of poor water quality can normally use.
6. The high temperature pinhole zoom lens is ourselves develop and product, horizontal resolution is greater than 1.3million pixels, under no cooling condition, it can withstand 350 °C.
7. Using manual zoom high temperature pinhole lens can satisfy different furnace, different product requirements.
8. Using electric zoom high temperature pinhole lens can remote control the size and the clarity of image.
9. Equipped with manual or electric enter and exit device.
10. Equipped with manual or electric rotary device to achieve full observation of tin bath.
11. By DCS can control the equipment to enter and exit.
Technical Parameters:
1. Lens definition: horizontal resolution is greater than 1.3 million pixels.
2. Lens variable focusing: F4-F20 continuously adjustable.
Compressed Air:
1. Total intake pipe: G3/4”
2. Connecting pipe: 3-G1/2”(increase stop valve)
3. Inlet pressure: 0.4MPa~0.7MPa
4. Inlet temperature: ≤35°C
5. Minimum flow: 0.45m³/min
Cooling Water:
1. Total intake pipe: G3/4”
2. Connecting pipe: 2-G1/2”
3. Inlet pressure: 0.1MPa~0.4MPa
4. Minimum flow: 30L/min
5. Inlet temperature: ≤35°C
Working Condition Temperature:
1. Control box: 5°C~50°C
2. Furnace temperature: ≦1200°C (continuous duty)
Dimension:
1. Probe hood: diameter is 89 millimeter, length is 1 to 3.8 meter (see figure)
2. Control box: 300*400*200 (width*height*thickness) (unit: millimeter)
3. Installation diagram: (see figure)
Installation Drawings:
http://www.czlmcctv.com/
-
Private Luxury Elevator
price: Negotiable
-
1GE GPON Bridge ONT
price: Negotiable
-
Public Electric Charging Points
price: Negotiable
-
Flat Head with Dramond Nibs and Saw Thread Chipboard Screw
price: Negotiable
-
Y81F-100 Automatic Hydraulic Metal Baler
price: Negotiable
-
Harvest Season Special Dinnerware Set
price: Negotiable